|
DCPSWatch Home
Major Areas
DC Public Schools
Mayoral
Takeover
Special Education
State Education
Agency
State Education Office
Vouchers
WTU
Wilson S.H.S.
Calendars
Board of Education
School Year
Columns
Elizabeth Davis
Ron Drake
Erich Martel
Nathan Saunders
Directories
Schools
Letters
Links
Organizations
DC Education
Compact
Parents United
Proposition 100%
Press
Search
DCWatch
Home
|
DCPS Reform Priorities of the Fenty Administration1
Introduction
Despite more than two decades of intermittent reform
efforts, the public education system in the District of Columbia
continues to struggle to meet its fundamental obligation: ensuring equal
access to an excellent education. It is indisputable that the school
district is well-populated with children eager to learn and
professionals eager to teach. But these good intentions, far too often,
do not translate into good outcomes.
In our frustration with this legacy of failure, as a
community, we have turned to explanations that place solutions out of
our reach:
- “The cycle of poverty is too
difficult to break.”
- “Children only spend one-third of tcheir day in school.”
- “The deplorable state of our
facilities makes it difficult for teachers or students to
concentrate.”
- “Collective bargaining agreements
limit creativity.”
- “Parents don’t do enough to
support their children.”
- “The central office is too
bloated.”
- “Charter schools are draining
limited resources.”
- “The government under-funds public
education”
Reasonable people can disagree about the relative merits
of each of these explanations, but these explanations in the aggregate separate us from a deeper truth – our schools
reflect our community. So the answer to our dilemma rests in our willingness to work together as a community on a
focused set of goals that are transparent and measurable. Having agreed
on these goals, we must then agree to hold each other accountable for
our performance in advancing them.
Purpose, Context and Inspiration
Under the leadership of the current Superintendent, DCPS
has articulated a new Mission, a set of Core Beliefs and Commitments, a
Master Education Plan (MEP) and a Master Facilities Plan (MFP). The
Fenty administration recognizes these reform principles and documents as
the product of significant community involvement. We are committed to
them as the starting point for our reform efforts following the passage
of the District of Columbia Public Education Reform Amendment Act of
2007.
This document highlights the starting point for the next
stage in reform of the District of Columbia Public Schools. Many of
these have been adopted already by DCPS but not fully implemented have been adopted already, but not fully implemented.
Others were not discussed explicitly in the MEP, but
support the implementation of MEP objectives. The priorities outlined
here are not intended to be all-encompassing.
As the process of education reform is an evolving one,
this will be a living document. It takes the aspirations and initiatives
of the MEP as its foundation, but also borrows and builds on the
experiences of previous reform efforts in DCPS. It also looks to reform
efforts in District of Columbia Public Charter Schools and other school
systems throughout the United States.
Specifically, this document is informed by:
- “A Nation At Risk,” National
Commission on Excellence in Education, 19832
- The Committee on Public Education
Report, “Our Children, Our Future”
- The 2001 DCPS 5-Year Strategic
Reform Plan prepared by McKinsey & Co.
- The 2004 Council of Great City Schools report,
“Restoring Excellence to the District of Columbia Public Schools”3
- The 2005 Council of Great City
Schools report, “Financing Excellence in the District of Columbia
Public Schools”4
- The 2005 District of Columbia Public
Schools “Declaration of Education”5
- The 2006 District of Columbia Public
Schools “Master Education Plan”6
- “Double the Numbers for College
Success: A Call for Action,” District of Columbia, 20067
- The Charlotte-Mecklenburg Schools
Strategic Plan 20108
- The Massachusetts 2020 Extended
Learning Initiative9
- The National Early Literacy Panel of
the National Institute for Literacy
- “Put Reading First,” Center for
the Improvement of Early Reading Achievement10
- The CYITC/Wallace Foundation
Out-of-School Time Initiative
- The 2006 Board of Education White
Paper on Special Education11
- A range of performance management
systems being developed nationally, including:
- Baltimore City Public Schools
SchoolStat System
- School District of Philadelphia
SchoolStat System
- Montgomery County Public Schools
M-Stat System
- Charlotte-Mecklenburg Balanced
Scorecard System
- Edmonton Alberta Satisfaction Survey
- “Financing Alternative Education Pathways,”
National Youth Employment Coalition, August 200512
- The NYC DOE Multiple Pathways Strategy13
- The Columbia Heights Shaw Family
Support Collaborative Gang Taskforce
- The Miami-Dade Public Schools Parent
Academy Program14
As this list demonstrates, public education reform has
become a widespread priority across the United States. While
implementation varies from jurisdiction to jurisdiction, many of the
core initiatives have been adopted and replicated broadly. These
commonly replicated initiatives rely on a number of generally–accepted
principles, including the following:
- Early literacy mastery is critical
to sustained growth in achievement.
- Mastery of fundamental abstract
mathematical ideas by middle school is critical for higher level math achievement in high
school.
- Early intervention in literacy can
mitigate subsequent behavior and special-education challenges.
- Truancy is highly correlated to the
incidence of dropping out.
- Middle school experience is a
critical determinant of high school experience.
- Early exposure to the benefits of
college and the challenges of college courses increases interest,
performance, and persistence in college.
- Access to a diverse set of
alternative education options (neighborhood-based and standalone) can be
critical in addressing behavior, truancy, and retention in middle
school and high school
- Targeted, school-based or
“embedded” professional development is more effective than
mass-delivered professional development.
- Quality professional development and a strong career
ladder are key determinants in the retention of high-performing teachers
and staff.
- Integrating real-time student
performance data into instruction throughout the academic year impacts
student achievement more than relying on high-stakes testing.
- Transparent accountability systems
aligned with professional development are more effective than
accountability systems that are difficult to understand or viewed as
arbitrary or punitive.
- Incentives and other recognition
programs help attract high-performing teachers to low-performing
schools.
- Consistent implementation of
discipline policies is critical to establishing a positive school
climate, which contributes to student & teacher performance.
- The type and degree of central
office support needed by local schools varies widely and should align
with individual school needs and performance.
- Aligning central office performance
measures and school-level or student achievement performance measures reduces “bureaucratic
compliance” and unresponsiveness at the administration level.
- School district central offices
should focus on functions central to teaching and learning.
- Public engagement and communication
are critical elements in building a constituency to support sustained education reform.
- Constructive and regular
parent/school engagement facilitates student achievement.
The Vision
To secure the District of Columbia’s place as an
indisputably world-class city, we must have a world-class education
system. We recognize that the goal of making DCPS the public school
system of choice seems audacious. However, as a community, we must
recognize that our future generations deserve better. Our reference
point must move beyond our own historical performance or that of other
urban jurisdictions and beyond the United States itself. We must seek to
transform DCPS into the premier urban public education system among
world capitals and ensure that all graduates are prepared to excel in
college and in a competitive regional and global economy. It is an
ambitious goal, and one this Administration will pursue tirelessly.
This endeavor toward excellence will demand an intense
focus on student success above all else, a strategic prioritization of
resources, and relentless attention to implementation. More than
anything, it will require unwavering commitment and hard work on the
part of thousands of adults within the school system and across numerous
District agencies, as well as by parents and community members.
Measures of Success
While standardized testing can only tell part of the
student achievement story, it is the easiest method of tracking and
comparing student performance at the most basic levels. At the local
level, we will continue to track the progress of our students using the
District of Columbia Comprehensive Assessment System (DC-CAS). At the
national level, the National Assessment for Educational Progress (NAEP)
will be our yardstick, and at the international level, the District of
Columbia will investigate the possibility of tracking its performance on
the Trends in International Math and Science Study (TIMSS) and Progress
in International Reading Literacy Study (PIRLS), the two most widely
used international measures of student performance.
Our starting point is sobering. We have seen the data,
perhaps so much that it ceases to enrage us in the way it should. On
average, our students are performing poorly by any measure. Moreover,
the data reveal a stunning achievement gap between white students and
students of color.
We will seek to raise the performance of every student We
will work with speed and resolve to intervene aggressively
on behalf of our lowest-performing schools and students, but only as a
beginning. We will also seek to increase the rigor, options, and
performance of even our highest-performing students.
The Task at Hand
Many of our students are challenged by circumstances
outside of the schools’ control, such as poverty and primary languages
other than English. But there can be no excuses. Significant research
indicates that schools and teachers can have an enormous impact on
student achievement despite the outside challenges a child brings to
school. We will seek to ease the burden on schools by addressing the
social issues impacting our students’ ability to excel. But we also
must move forward aggressively to drive high levels of achievement
despite these obstacles.
We have taken the first bold step toward eliminating the
artificial boundaries between DCPS and the network of agencies
controlled by the Executive Office of the Mayor. But this change is only
the first step. Success will require a change in mindset across the
board. We must earn the trust of educators, support staff, parents,
students, and the community at large by demonstrating that business as
usual is no longer acceptable. In return, we will demand investment and
hard work from all of these stakeholders. Across the District
Government, we will demand agencies define their roles and measure their
outcomes from a new vantage point. The failure of any child will be a
collective responsibility.
Fundamental Ingredients to Success
While success will ultimately depend on dozens of smart
strategies, several overarching approaches will ground all that we do.
Human Capital
The school system must attract and retain talent. The
bestdesigned plan is only as good as the people who carry it out.
School-based support staff and central administrators alike must have
the skill and will to attain challenging goals. Attaining our goals,
therefore, relies heavily on recruiting effective personnel at every
level, and building their capacity through meaningful professional
development.
Exceptional Service
The school system must serve its stakeholders. Students,
parents, teachers and administrators should feel free to express their
needs and concerns. They should also feel confident that DCPS will
respond effectively.
Strong System of Accountability Balanced with Autonomy
The school system must adapt and grow. Addressing the
diverse and changing educational needs of the District of Columbia
requires freedom, flexibility and accountability in the central office
and in every classroom.
Data-Driven Decision Making
The school system must measure. Accurate data will help
administrators assess learning and make informed decisions to promote
student achievement. To ensure that school data is properly utilized in
DCPS, the Chancellor will institute an accountability system referred to
as SchoolStat. A detailed description of SchoolStat is included in the
Appendix.
Timeframes for Action
Beginning the work detailed in this document is critical
– we must act with the same urgency as the challenges presented. Yet
it is also important that the work be informed and that steps taken are
strategic. Thus, the timeframes specified in this document are
approximated and represent the intention and prioritization of the
administration regarding the proposed activities. It may be necessary to
adjust the timeframes in order to correspond with information and
recommendations developed through internal reviews of the system
management, operations, and finances. Review of these timeframes will be
ongoing throughout the transition period, and will be updated as
necessary.
Goal I: Ensure Challenging Curriculum and Instruction for
All Students15
|
Strategy 1: Refine the K-8 comprehensive reading model
(Expands initiative articulated in Master Education Plan)
|
| Activity |
Timeframe (subject to effective date of Legislation) |
Outcome/Measurement |
| Assess all K-3 students at the beginning and end of each
school year. Use these data to inform short-term reading intervention
strategy.
Students identified as struggling will receive
developmentally appropriate intensive reading support, including
additional time focused on receptive and expressive language and
pre-reading skills. Intensive intervention will continue until students
can meet grade level performance standards.16 |
Develop standardized reading assessment protocol by the
end of the 2007-2008 academic year, so teachers can be trained.
Develop intensive reading curriculum and associated
intervention strategies within 180 days of the transition of authority.
|
Conduct and analyze reading assessments at the beginning
of each school year for all K-3 students. Key tracking measure for
principals; (see SchoolStat). Should drive allocation of resources.
Conduct end-of-year reading assessments for all K-3
students. Data analysis will include measurement of percentage of
students who have changed status from struggling to proficient, or the
reverse.
|
| To boost reading performance in Grades 6 through 8,
students reading below grade level will be enrolled in reading class
taught by trained reading specialist, until grade-level proficiency is
achieved (in addition to their standard language arts class). |
Pilot additional reading class in two middle schools for
second semester of 2007-8 academic year (potentially as part of Expanded
Learning Time pilot – see below) |
Analyze intervention, including comparing gains among the
treatment group of students with a control group at another middle
school. |
Strategy 2: Refine the K-8 comprehensive mathematics model (Expands initiative
articulated in Master Education Plan)
|
| Activity |
Timeframe (subject to effective date of Legislation) |
Outcome/Measurement |
| Students struggling to achieve grade level standards in
middle school will receive intensive interventions until they meet grade level
standards.17
Math coaches will train teachers up front and support
them on an ongoing basis through model lessons and classroom
observations. |
Pilot double math class in
two middle schools for 2007-2008 academic year, based on Kamras model developed at
Sousa. Option for Expanded Learning Time school. |
Analyze intervention, including comparing gains among the
treatment group of students with a control group at another middle
school. Potential replication across system.
|
Goal I: Ensure Challenging Curriculum and
Instruction for All Students
|
Strategy 3: Accelerate intensive intervention
strategies lowest performing high schools (Expands initiative
articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Identify high schools that qualify for
reconstitution and begin development of intervention strategies.
|
Begin planning immediately.
Implementation of intervention strategies beginning in 2008-2009 academic year.
Activity will be ongoing.
|
Comprehensive design and implementation plans, reflecting
fundamental change in approach at these schools.
Increased graduation rates.
|
Strategy 4: Begin reform initiatives targeted at
middle schools. (Expands initiative articulated in Master
Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Target middle schools for Teacher
Advancement Program
|
Within 60 days, identify one school to
begin model in Fall 2008.
|
Secure private investment within 90 days.
|
| Explore creation of Eight-PLUS
program18, which would provide mandatory intensive
remedial instruction for students who do not pass eighth grade.
Intensive “double math” – see above.
|
Analyze research on 8+ interventions in
other jurisdictions within first 100 days.
|
Recommend whether to implement
program and establish timeline for next steps.
Align with strategy to increase graduation rates at the high school level.
|
Strategy 5: Expand access to more rigorous courses
at the high school level. (Expands initiative articulated in
Master Education Plan)
|
| Consistent with the CYITC/Wallace
Foundation program, expand middle school out-of-school time programs
including academic, enrichment, and athletic programs.
|
Assess current offerings by end of first 6
months.
|
Increase student engagement (including
attendance) and achievement.
|
Expand purview of Executive Director for
Advanced Studies to all advanced-learning programs across all high schools, including
but not limited to:
- Add or expand college-prep programs such as Springboard, AVID, or other AP Incentives
Programs.
- Partner with area colleges and universities to expand middle or
early college programs, such as the programs at Bell Multicultural
High School and Friendship Collegiate Academy PCS.
Provide the option of 2-year AP courses, where students commit to “looping” with
teacher, providing them extra time to close the preparation gap.
|
Redefine and staff position within first 100
days.
|
Comprehensive strategic plan within 60
days of staffing this newly defined role.
Increase graduation rates.
|
Strategy 6: Pilot extended learning programs
through a competitive grant program (Expands initiative
articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
Explore extended learning pilot as possible
vehicle for:
- Increased preparation
opportunity for AP courses.
- Additional time for science
- Double math or intensive
reading course in middle school
- Music and fine arts, using
external partners as providers
- Foreign language programs
- Regular sustained professional development for teachers
|
Develop RFP within 90 days.
Award planning grants by December, 2007.
|
Implement up to five schools in 2008-09.
|
Strategy 7: Communicate performance data to parents
and students regularly and consistently. (New initiative)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Redesign student report card. Develop a
district-wide K-8 report card that provides meaningful information on student
progress toward state standards.
|
- Establish a Report Card
Committee within 60 days.
- Develop and publish the new
report card within 90 days after creation of Report Card Committee.
- Conduct report card training
sessions for teachers within 60 days of publication of new report card
template.
|
Begin report card implementation in
conjunction with the 2008-09 school year.
|
| Redesign DC-CAS parent report. Create a
standard template with supporting information (including information on SES
alternatives, etc.) for reporting individual DC-CAS results.
Parents will be empowered to make informed decisions about their child’s
schools.
|
- Identify models from other jurisdictions within 60 days (Chicago
is one)
- Draft template within 4 months
|
Include question on parent satisfaction
survey.
Publicized and distribute using a variety of communication channels, including
meetings, Channel 99, the DCPS website, print materials, email, Connect-Ed and
other tools.
|
Strategy 8: Expand Career and Technical Education
(Expands initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Break ground on Phelps.
|
2007-08 school year
|
Construction on schedule.
|
| Replicate Cardozo building trades
program in two additional high schools.
|
Begin working with community partners
immediately.
|
One additional program operational by
2007 school year; a second by 2008.
|
| Partner with labor unions to strengthen
programming and tie to key initiatives in apprenticeship programs across District.
|
Pull together working group of these
partners within 90 days.
|
Comprehensive menu of potential
partnerships, timeline for implementation.
|
| Partner with WMATA and other major
skilled employers to develop certified HS training programs.
|
Implementation timelines established by
Spring 2007.
|
Comprehensive menu of potential
partnerships, timeline for implementation.
|
Strategy 9: Expand foreign-language instruction at
all grade levels (New initiative)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Expand the availability of bilingual-immersion programs across the city,
particularly in wards east of the river.
|
Identify potential school sites during 2007-08 school year and begin implementation
in 2008-09.
|
Increase rigor and attractive programs of
choice for parents, and increase equity in access to programs across the city.
|
| DCPS will expand partnerships with area
embassies and cultural institutions to increase the foreign language program
offerings at all grade levels.
|
Identify partners during 07-08 school year;
begin instituting programs in Spring 2008.
|
Significantly expand offerings.
|
| Given the research-based consensus that
early exposure to foreign languages facilitates foreign language mastery and that students
mastering second languages outperform monolingual peers in verbal and
non-verbal skills as well as standardized college entrance exams, DCPS
will explore the expansion of foreign language programs to serve
elementary and middle school students.19
|
A phase-in process will start in the 2009-10
school year.
|
|
Strategy 10: Expand opportunities for gifted and
talented students (Expands initiative articulated in Master
Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Research creative programming in public
charter schools and in other jurisdictions for potential replication within
DCPS.
|
Consult
with NAGC within first 6 months.
|
Better identify GT students.
Increased quantity
and quality of services.
|
Strategy 11: Address the needs of English Language
Learners (ELLs) (Expands initiative articulated in Master
Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Train principals to meet the needs of ELLs.
|
Ongoing, through principals’ leadership institute.
|
|
| Expand Parents as Partners program.
|
Assess
capacity within first 6 months. Program expansion to begin in 2008-09
school year.
|
Question on
parent survey.
|
Goal II: Teachers and Principals Will Deliver High
Quality Instruction to Every Student20
|
Strategy 1: Develop a talent pipeline for teachers,
teacher leaders, and principals (Expands initiative articulated in
Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
Front end recruitment of high quality
teachers and principals:
- Explore expansion of
alternative certification programs such as the DC Teaching Fellows program.
- Expand the Teach For America program.
- Partner with the higher
education and private sectors to develop incentives supporting the recruitment of high
need, low supply teachers (e.g., special education and mathematics).
|
Work to begin immediately; ongoing.
|
See SchoolStat below
|
| Develop career ladder for teachers – into
teacher leadership roles (mentor, master, coach) and into the administration.
|
100 days.
|
Comprehensive overview of current career
ladder opportunities (teacher leadership positions, leadership training, etc.);
timeline for addressing identified needs.
|
| Develop SchoolStat measures for human
resources department. Create a bonus program for HR to reward its efforts for
opening the school year with no vacancies and/or meeting recruiting and staffing
targets.
|
60 days
|
SchoolStat ‘data dashboard’21 with HR
specific indicators, including percent of teaching positions filled by the first day of
school and throughout the school year.
|
Strategy 2: Improve teacher working conditions.
(New initiative)
|
| Activity
|
Timeframe (subject to effective
date of legislation)
|
Outcome/Measurement
|
| Establish an independently administered
school survey to collect teacher information on working conditions.
Require that concerns raised in survey be addressed in school improvement plans.
Data will be disaggregated by school, maintaining the confidentiality of
individuals.
|
Develop RFP within 60 days.
Identify vendor within 90 days. (Possible project for research consortium; see
below),
Complete survey administration within 6 months.
|
Develop, administer and analyze survey in
accordance with time line.
Data will serve as SchoolStat measure for principals.
|
Strategy 3: Refine professional development for
improved instruction (Expands initiative articulated in Master
Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Conduct an audit of DCPS professional
development programs to catalogue range of programs, assess quality, and prioritize
based on strategic goals.
|
120 days.
|
Report assessing strength of professional
development program and making recommendations for improvements.
|
| Institute school-based professional
development models on a pilot basis, focusing on building the capacity of
teachers to collaborate, analyze data and adapt practice accordingly, and for
principals to implement and lead school wide reform strategies.
|
Expand CIT/NLNS/TFA partnership to 2-3 more schools in 2007-08 school year.
Identify schools within 30 days.
Investigate feasibility of introducing TAP in 1-2 schools for 2007-08 school
year.22
|
Implementation plan.
Assess and improve the capacity and effectiveness of the Principals’ Leadership
Institute.
|
| Assess current implementation of New
Teacher Induction and Mentoring program and adjust as necessary to meet original
goals of program.
|
120 days. Institute aggressive mentor
recruitment program to generate strong pool of candidates.
|
Fully staffed mentor program, in
compliance with grant requirements.
|
Strategy 4: Recognize and reward high-performing
staff with individual and school wide compensation
initiatives.
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Implement the differentiated
compensation pilot in the current WTU contract.
|
Where possible, roll out models for 2007-08 school year or establish planning year.
|
Implementation plan.
|
Explore additional salary and bonus
initiatives for targeted schools, based on rigorous standards of evaluation,
including:
- Rewarding principals for
meeting targets on school climate and parent engagement measures.
- Rewarding teachers for
achieving advanced performance-based certification
|
Analysis of options and discussions with
WTU to begin immediately.
|
Summary of options and agreed upon
implementation plan.
|
Strategy 5: Ensure equitable staffing for every
school. (Expands initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Explore the creation of incentive programs
aimed at increasing the number of high-performing teachers at low-performing
schools, such as signing and performance based bonuses, and tuition reimbursement
programs.
|
Begin analysis immediately.
|
Summary of options analysis and agreed
upon implementation plan.
|
| Adjust school-level budgeting process to
allocate real dollars, rather than teaching positions.
Schools could then allocate any “extra” funds towards teacher
professional development or support.
Current teachers would be grandfathered in, at the
principals’ discretion.
|
Begin budget analysis immediately.
|
Established for 09 budget.
|
Goal III: Safe & Orderly Schools
|
Strategy 1: Ensure student discipline policies are
enforced consistently throughout school district. (New initiative)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Revise the current student discipline
policy to include alternatives to out of school suspension.
Offer training to principals and teachers on the new policy.
Develop a handbook that will be distributed to principals, teachers, parents,
and students to ensure that all parties are aware of the new policy.
|
Begin policy revision immediately.
|
Implement the revised student discipline
policy at the beginning of the 2007-08 school year. Monitor school performance
measures via SchoolStat.
|
Strategy 2: Reorganize and expand alternative
education programs. (Expands initiative articulated in Master
Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Expand range of alternative education
programs including increasing neighborhood school-based models and
stand-alone models.
|
Conduct an assessment and evaluation of
existing alternative education programs. Assessment will begin within 100 days.
|
Expand programs where gaps exist to
serve more students.
|
Strategy 3: Train teachers and principals on best ways
to handle student behavior issues. (New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Partner with experienced community-based organizations to provide
professional development opportunities focused on student behavior management
(including bullying and gang activity).
|
Search for community partner will begin
immediately.
Develop a professional development action plan for phased implementation
during the 2007-08 school year.
|
Incorporate professional development
strategy into professional development calendar.
|
| Evaluate evidence-based whole school
behavior management models for possible implementation in local schools. Review
effectiveness of current program implementations, such as the Positive
Behavior Intervention & Support (PBIS) program being used locally at DCPS
schools (e.g., Simon ES) and DC public charter schools.
|
Evaluation will begin at the conclusion of
the 2006-07 school year.
|
If successful, PBIS will be expanded.
|
Strategy 4: Continue/expand the work of the Truancy
Task Force (Expands initiative articulated in Master Education
Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Expand work of the task force to include
focus on dropout prevention and re-entry strategies.
|
Truancy Task Force will begin expansion
work during the 2007-08 school year.
|
Reduce dropout rate and return more
students to the school system.
|
Goal IV: Develop a Strong System of Accountability
Balanced with School Level Autonomy23
|
Strategy 1: Develop a systemwide SchoolStat
accountability system. (New initiative)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Identify first set of tracking measures
around special education, human resources, and school climate.
|
60 days.
|
Develop data dashboards for key
functions.
|
| Orient all employees to concept,
philosophy, and process of SchoolStat
|
60 days.
|
|
| Bring all managers through a process of
identifying their top level tracking measures
|
180 days.
|
Develop department-level dashboards for
every function.
|
Strategy 2: Establish data infrastructure and
research partnerships that allow effective analysis. (Expands
initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of
legislation)
|
Outcome/Measurement
|
| Implement state-wide data system with
unique student and teacher identifiers.
|
Immediately and ongoing.
|
95% accuracy of student identifier system
by the end of the 2007-08 school year. “Bad data reports” feed into a SchoolStat
measure for principals.
|
| Initiate “Schools Research Consortium”
that would provide capacity to inform policy decisions.
|
90 days.
|
Establish independent entity.
|
| Partner with researcher to kick-off value
added study of teacher effectiveness
|
Identify researcher and research question
within 60 days. First round of analysis within 9 months.
|
Ongoing analysis of teacher value-added
by source of teachers, professional development programs.
|
Strategy 3: Shift resources and decision-making to
the schools, and away from the central administration. (Expands initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe (subject to effective date of legislation)
|
Outcome/Measurement
|
| Develop a transparent and phased-in
program for earned autonomy with strict accountability measures.
|
Establish baseline within first 100 days.
Identify currently operating models of autonomy in DCPS and clear opportunities (e.g., innovation pilot
schools).
|
Timeline and targets for phased in
implementation for first 24 months.
|
Goal V: Ensure Exceptional Service
|
Strategy 1: Conduct a comprehensive service audit
and service improvement program. (New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Develop a program to baseline and assess
responsiveness to stakeholders across communication channels (in-person visits,
phone calls, email, etc.)
|
Begin audit within 100 days. Create a
service improvement program with the results of the audit.
|
Develop solutions for improving
satisfaction levels , addressing such issues as organizational culture, goals, employee
incentives, service processes, communications, and service measures.
|
| Develop an incentive and recognition
program that encourages and rewards high quality service delivery.
|
|
|
Strategy 2: Develop service standards. (New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Establish service standards by department
or activity. Integrate service standards with employee performance management
system.
|
Begin standards development within 100
days.
|
Implement standards system wide.
|
Strategy 3: Provide service training and
communication on customer service initiatives. (New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| DCPS will provide ongoing employee
training and communication on customer service initiatives and on techniques to
improve quality and process.
|
Training will be ongoing.
|
Offer customer service training to all
DCPS employees, including principals, teachers, and administrative staff. Align
service training with newly implemented service standards.
|
Strategy 4: Strengthen employee communications.
(New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Strengthen internal communications
through multiple channels including Connect-Ed, email, DCPS Intranet,
DCPS-TV99, meetings, special events and other communication channels.
|
Begin work on the internal
communications program during the 2006-07 school year.
|
Inform DCPS employees about news and
information on a timely basis.
|
| DCPS will start an employee feedback
system to monitor satisfaction levels and to identify key issues and concerns. We
will develop print and online versions and will poll employees annually to
determine the success of communications and job satisfaction.
|
Distribute annual survey to teachers at the
conclusion of the 2006-07 school year.
|
Analyze survey results and report
annually to the Chancellor and executive staff.
Make changes as needed.
|
Strategy 5: Business operations improvement.24
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Conduct comprehensive operational
review to identify short and long-term opportunities for service improvements
and efficiencies. Priority areas include personnel, procurement, Medicaid
recovery, and food service.
|
Convene teams to evaluate key business
operations within 100 days.
These teams will compare best practices and benchmarks to actual in-house
performance and develop improvement plans for each operation.
Implementation of the improvement plans will begin during
the 2007-08 school year. Business operations will be evaluated on an
ongoing basis.
|
Improve service outcomes on SchoolStat
measures identified during audit.
|
Goal VI. Build on Our Community’s Assets25
|
Strategy 1: Create an Office of the Ombudsman. (New
initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Partner with the Executive Office of the
Mayor to implement the proposed ombudsman program.
|
Begin communication regarding the
existence of the Office of the Ombudsman within 100 days.
|
The Office of the Ombudsman will resolve
concerns in a timely manner and identify opportunities for systemic improvements
as appropriate.
|
Strategy 2: Improve communication and collaboration
with parents and stakeholders. (Expands initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Develop new parent communication
strategy.
Develop new parent handbook, parent newsletter, and other communication
tools.
Partner with neighborhood based organizations (private and public) to
distribute communication tools.
|
Begin development of parent
communication strategy and tools within 100 days.
|
Inform parents of the programs, services,
and support DCPS has to offer.
|
Strategy 4 [sic]: Increase public involvement. (Expands
initiative articulated in Master Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Communicate regularly with parents,
school employees, public and private sector leaders as well as leaders in the
faith community in order to get their input.
|
Establish a working group, charged with
recommending strategies to improve communication between DCPS and community stakeholders, within 100 days.
Public engagement will be ongoing.
|
Increase collaboration between DCPS and
other stakeholders via regular meetings, opinion polls, and advisory committees
designed to seek input from the public about decision making processes at DCPS.
|
| DCPS will
initiate a feedback system for key stakeholders, including
students and parents. Satisfaction with DCPS’ responsiveness
will be gauged annually using statistically valid public opinion
polls.26
Distribute service feedback cards to all schools and
departments, as well as made available online, with results
monitored and reported annually to the Chancellor.
|
|
Increase responsiveness to parent, student,
and community concerns.
Acknowledge concerns/complaints within 24 hours.
Offer solutions within 30 days.
|
Strategy 5: Expand community partnerships
/volunteerism. (Expands initiative articulated in Master Education
Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Develop partnerships in the community
that promote student academic success, student mentoring and a safe
environment. Review current programs and recommend changes if necessary.
Partner with faith leaders to provide additional support for DCPS students,
especially those who may be at risk of failing in school.
|
|
A better organized office of strategic
partnerships and more invested volunteers from local business and other
community entities.
Increased volunteerism in DCPS schools.
|
Strategy 6: Increase Principal Accountability for
Parent and Community Outreach (Expands initiative articulated in
Master Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Include effective proactive parent &
community outreach as part of principal accountability framework.
|
Principals will receive training on ways to
provide effective outreach to parents and community members. Amend principal
evaluation instrument to include measurements for parent and community
outreach beginning in the 2008-09 school year.
|
SchoolStat Measures.
Amended evaluation instrument.
|
Strategy 7: Host regular media briefings. (New initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| The Chancellor’s office will hold regular
media briefings to inform reporters and the public about DCPS news and
information.
|
Begin regular briefings within 100 days.
|
Increase level of transparency between the
public and DCPS.Release regular media briefing schedule.
|
Strategy 8: Partner with EOM’s Office of Parent
& Community Involvement to launch Parent Academy. (New
initiative)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Provide training to parents through Parent
Academy courses in areas such as: GED, computer skills, family literacy, and other
basic life skills. Organize these courses by partnering with local private and public
sector groups and offer them free of charge at schools, public and private
sector workplaces, and libraries.27
|
Begin implementation of Parent
Academies in the 2007-08 school year.
|
Increase parental involvement in the
education process, which has been shown to have a direct and positive impact on
student achievement.
|
Strategy 9: Strengthen Local School Restructuring Teams (LSRTs). (Expands initiative
articulated in Master Education Plan)
|
| Activity
|
Timeframe
|
Outcome/Measurement
|
| Strengthen LSRTs so that they can focus
on school improvement planning and student performance.
|
Provide training for administrators and
parent leaders beginning in the 2007-08 school year.
|
Stronger school improvement plans and
budgets.
|
Measures of Success
Following are the high level Measures of Success to which
we will hold ourselves accountable. The Chancellor would propose targets
for each measure.
- Student Achievement Outcomes
- Percentage of students performing at
or above proficiency in reading in Grades 3-8 (BASELINE: 35% at or above
proficiency in reading in 2006. (DC CAS)).
- Percentage of students performing at
or above proficiency in mathematics in Grades 3-8 (BASELINE: 26% at or
above proficiency in mathematics in 2006. (DC CAS)).
- Percentage of students performing at
or above proficiency on writing assessment in Grades 4 and 8. (BASELINE:
11% of DCPS 4th graders at or above proficiency in writing; the NAEP
national average was 27%. 10% of DCPS 8th graders at or above
proficiency in writing; NAEP national average of 30%. (NCES, 2002 Trial
Urban District Assessment))
- Narrowing of achievement gap on all
academic measures among groups classified by race, ethnicity and
socioeconomic status.
BASELINE:
Reading: 91% of white students tested at or above
proficiency in reading, more than 3 times the rate of black students
(29%) and 2.25 times the rate of Hispanic students (40%). (2006 DC CAS)
Mathematics: 80% of white students tested at or above
proficiency in mathematics, 4 times the rate of black students (20%) and
2.6 times the rate of Hispanic students (31%).
- Percentage of students graduating
within 5 years (BASELINE: 43% of entering 9th graders graduate within 5
years. (October 2006 DTN))
- Percentage of Advanced Placement
exams receiving a score of 3 or higher (BASELINE: DCPS 28%; national
average 58%. (College Board, 2006))
- Increase in average score on the
SAT, accompanied by increase in percentage of students who take the test
will also increase. (BASELINE: 1204 out of 2400. (2006)
- Percentage of students will meet or
exceed the national average on the National Assessment for Educational
Progress (NAEP) in reading, mathematics and science.
- Student performance data will be communicated to
parents and students on a regular basis and in a consistent manner.
Timeframe
These Measurements of Success are in
place through the end of the second full fiscal year that the schools
are under Mayoral control. If the necessary legislation transferring
control to the Mayor is approved by Congress prior to the start of
FY2008 (October 1, 2007) then the goals here will go through the end of
FY2009 (which ends September 30, 2010). If the necessary legislation is
approved after the start of FY2008, then these goals will go through the
end of FY2010 (which ends September 30, 2011).
Instructional Staff
- Percentage of effective teaching
staff. Effectiveness will be measured by fair and rigorous evaluations,
including objective student outcome measures and research-based
assessment of instructional practice. Target will be set after a district-wide teacher accountability system has
been proposed, evaluated, and adopted.
- Percentage of teaching positions
filled on first day of school, and at intervals throughout the year.
- Percentage of key instructional
support positions filled at predetermined points during the year. This
includes, but is not limited to, math and literacy coaches, and new
teacher mentors.
Conditions for Effective Teaching and Learning
- Percentage of “certified”
classrooms. Standards will be defined for the “certification” of
classroom readiness (necessary instructional materials and supplies). Data to
be reported in such a way as to reveal any systematic differences between groups of schools (grade level,
poverty level, performance level, etc.)
- Percentage of schools meeting DCPS
standards for technology (Baseline standards to be determined.).
- Percentage of schools meeting
standards for extra-curricular activities. Minimum standards will be
developed for extra-curricular activities at all levels.
(Extra-curricular activities are extensions of the core curriculum and
provide an opportunity for students to use critical thinking
skills learned in the classroom outside of the traditional classroom setting. Examples include chess, Math Olympiad,
National Academic League, Debate, Science Olympiad, Odyssey of the Mind, and Model UN.) Once
minimum standards are set, the baseline percentage of all schools
meeting the DCPS standard of extra-curricular activities will be set and
tracked moving forward.
- Percentage of schools receiving the
top rating(s) on the DCPS SchoolStat Accountability System; (see
Appendix 1).
Safe and Orderly Schools
- Percentage of students indicating
they feel safe at school. (Survey and baseline data to be completed by
end of first year of mayoral control.)
- Percentage of parents indicating
they believe schools are safe. (Survey and baseline data to be completed
by end of first year of mayoral control.)
- Change in the number of
state-reportable incidents of inappropriate behavior per 1,000 students.
Service and Accountability
- Percentage of school employees,
parents and community members agreeing that DCPS provides accurate and
responsive service on annual satisfaction surveys.
Strong Links with Parents and the Community
- Percentage of DCPS parents agreeing
that DCPS is performing well and is on the right course.
- Percentage of community members
agreeing that DCPS is performing well and is on the right course.
APPENDIX 1: DCPS SchoolStat Accountability System
SCHOOLSTAT
Context and Purpose
The Fenty Administration has emphasized throughout the
District Government a deep commitment to data-driven decision-making,
transparency, and accountability to outcomes. Borrowing from what has
become common practice in the business sector, and increasingly in the
nonprofit and public sectors, the Government of the District of Columbia
has instituted CapStat in the Executive Office of the Mayor. In turn,
DCPS will institute a “SchoolStat” program, focused on the key
outcome and input data of the school district. Baltimore City Public
Schools’ SchoolStat and Montgomery County Public Schools’ M-Stat
both provide viable models for applying this approach to school systems.
SchoolStat in DCPS will have the following major
objectives:
- Continuous improvement. Maximizing
progress toward this Administration’s ambitious goals for the school
system will require constant reflection and course adjustment. Rigorous
and regular analyses based on data will fuel and focus that learning
process.
- Performance management. SchoolStat
embodies the adage “what gets measured gets done.” The complexity of
the school system’s work invites a cacophony of individual priorities.
When expectations are disparate, progress is diffuse. The SchoolStat
approach will drive the kind of shared focus necessary to accelerate
change. In turn, adults across the system will be accountable to
important outcomes and indicators, supporting a goal-driven culture
rather than one focused on bureaucratic compliance.
- Transparency. Shining a light on
student outcome data and on key inputs provides all members of the
community – inside and outside DCPS - with a shared language for
discussing the school system’s challenges and possible solutions.
Progress can be publicly documented and celebrated even as obstacles are
laid bare.
Structure and Process
The SchoolStat process will include four basic elements:
- Establishing metrics that reflect key priorities
- Gathering and organizing of data
- Holding SchoolStat sessions, where the key relevant
parties examine the data and strategize over what action steps to take
in response
- Applying “take-aways” through
targeted communication, technical assistance, and follow-up.
Depending on the nature of the data being examined, this
cycle will repeat at varying intervals. For example, where a data point
is variable over the course of a month (e.g., number of up-to-date IEPs,
number of completed work orders, first grade scores on DIBELS), it might
be revisited on a frequent basis. Where a data point is fixed for a year
(e.g., DC-CAS scores, college completion rate), it could serve as
important context for multiple SchoolStat sessions, but would not be
analyzed directly more than once a year.
Reflecting the central importance of this strategy,
SchoolStat will reside in the Chancellor’s office. Based on the
established priorities of the district – laid out in this plan, the
Master Education Plan, and strategic plan for the operational side –
and with the input of staff members at all levels of the organization,
the Chancellor will define the key metrics to be tracked and examined.
These data points will be a combination of high level outcome data
(e.g., DC-CAS results, SAT scores) and critical input data (e.g.,
algebra completion rates, teacher attendance). The SchoolStat process
will work to uncover trends and lessons within the data by
disaggregating it by sub-group (e.g., school, student demographics) and
by looking for correlations between particular practices and results.
In advance of the formal SchoolStat session, data will be
gathered, sliced, and organized in ways that hypothesize the underlying
causes of the challenge and possible solutions. SchoolStat sessions
themselves will bring together different parties across the school
district, depending on the issue being analyzed. Critical to the process
will be having at the table the range of functions that impact a
particular measure. For example, in focusing on algebra completion
rates, it would be important to have Human Resources and Professional
Development at the table, in addition to Academic Services and
Accountability. Based on the focused analysis during the SchoolStat
session, takeaways will be clearly communicated to all relevant parties,
with specific expectations for next steps including when data will be
revisited.
While the focus of SchoolStat is on high level district
priorities, over time the SchoolStat team will provide guidance and
technical assistance to functional teams across the district interesting
in implementing this strategy at a team level.
Implementation Plan
| August 2007
|
Chancellor establishes system-wide data dashboard,
reflecting the key priorities of the district, with the
approval of the Mayor
|
| September 2007
|
Launch of SchoolStat sessions, with focus of
familiarizing people with the process
|
| November 2007
|
First formal session, followed by bi-weekly
sessions for remainder of school year
|
| June 2008
|
Each major function of the school district
finalizes its own data dashboard with the approval of the Chancellor
|
| 2008-09 School Year
|
Data dashboards become the central element of the
school district’s performance management system.
|
1 Special Education reform priorities are addressed in
more detail in a separate document.
2 http://www.ed.gov/pubs/NatAtRisk/recomm.html
3 http://www.cgcs.org/pdfs/DCPSReportFinal.pdf
4 http://www.cgcs.org/pdfs/DCfinance.pdf
5 http://www.k12.dc.us/declaration/DCPS%20exec%20summary_English.pdf
6 http://www.k12.dc.us/master/MEP_final.pdf
7 http://www.seo.dc.gov/seo/frames.asp?doc=/seo/lib/seo/news_room/2006/DoublingNumber_FINAL.pdf
8 https://extranet.cms.k12.nc.us/news/stories/internetNews/pdf/11A29A200664350AM.pdf
9 http://www.mass2020.org/
10 http://www.nifl.gov/partnershipforreading/publications/PFRbookletBW.pdf
11 http://www.k12.dc.us/DCps/boe/SPED-Paper_0106.pdf
12 http://nyec.modernsignal.net/content/education/exec_summary_profiles.pdf
13 http://www.ytfg.org/documents/Presentation_to_Regents_Broad_Distribution.pdf
14 http://theparentacademy.dadeschools.net/
15 Goal from the Master Education Plan
16 See “Put Reading First,” Center for the
Improvement of Early Reading Achievement, National Institute for
Literacy, http://www.nifl.gov/
17 See the Massachusetts Department of Education Middle
School Math Initiative (MSMI) at http://www.ed.gov/rschstat/research/progs/mathscience/descriptions/mass_sea_midschmath.pdf
and “An Examination of School-Based Factors Affecting the Grade 8
Mathematics MCAS Performance” at http://www.ednews.org/articles/999/1/An-Examination-of-School-Based-Factors-Affecting-the-Grade8Mathematics-MCAS-Performance/Page1.html
18 Multiple school districts throughout the United
States, including Charlotte-Mecklenburg, have proposed the use of an
Eight-PLUS program for struggling eighth-graders who require remedial
instruction in order to move on to ninth grade.
19 See recommendation A6 of the 1983 report, “A Nation
at Risk,” at http://www.ed.gov/pubs/NatAtRisk/recomm.html
20 Goal from the Master Education Plan
21 The term ‘data dashboard’ has been used
extensively in the private sector for many years, and recently has
gained acceptance and utility in the public sector, particularly in
public school districts. It refers to a single place of reference for a
collection of data points or indicators that enable the user to get an
overall sense of performance in real time according to pre-determined
metrics of success. A common way to describe a data dashboard is to
think of the dashboard display in a car – - above the steering wheel
where it is easily in view, providing to the driver information on
speed, fuel, operating systems, safety, etc.
22 The Teacher Advancement Program, TAP, is a
school-level professional development and performance pay program
developed by the National Institute for Excellence in Teaching.
23 Goal from the Master Education Plan
24 Goal 2 of the DCPS 2005 “Declaration of Education”
states: “Ensure management and operations support high-quality
teaching and learning in every classroom in every school.”
25 Goal from the Master Education Plan
26 Multiple school districts throughout the United
States, including Charlotte-Mecklenburg, have proposed the use of
statistically valid polls or satisfaction surveys as a feedback or
accountability system. In Canada, the Edmonton Public Schools have a
long history of surveying stakeholders and include these survey results
in their annual performance reports. For an example, see the 2005-2006
Edmonton Public Schools Annual Education Results report at http://www.epsb.ca/datafiles/AnnualEdResultsReport_0506.pdf
27 Miami-Dade Public Schools introduced a “Parent
Academy” program in 2004 that has received nationwide recognition and
has inspired several other school districts to launch similar parent
“universities” or “colleges” aimed at providing parents with
parenting training, as well as increasing access to other adult
education options that can contribute directly or indirectly to
increased parent participation in student lives.
|